Kosovo (UNSCR 1244) vs North Macedonia: Dealing with construction permits: Quality of building regulations
Kosovo (UNSCR 1244)
2 DB16-20 methodology
in 2019
North Macedonia
2 DB16-20 methodology
in 2019
Kosovo (UNSCR 1244) rank
1st
North Macedonia rank
1st
Dealing with construction permits: Quality of building regulations over time
- Kosovo (UNSCR 1244)
- North Macedonia
How they compare
Kosovo (UNSCR 1244) currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in North Macedonia, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, North Macedonia has been ahead every year.
Kosovo (UNSCR 1244) ranks 1st and North Macedonia ranks 1st of 186 countries.
Frequently asked questions
- Which has higher dealing with construction permits: quality of building regulations, Kosovo (UNSCR 1244) or North Macedonia?
- Kosovo (UNSCR 1244), at 2 DB16-20 methodology against 2 DB16-20 methodology in North Macedonia as of 2019.
- What is the difference in dealing with construction permits: quality of building regulations between Kosovo (UNSCR 1244) and North Macedonia?
- 0 DB16-20 methodology, with Kosovo (UNSCR 1244) ahead.
- How many years of comparable data are there for Kosovo (UNSCR 1244) and North Macedonia?
- 6 years are reported by both, from 2014 to 2019.
- How do Kosovo (UNSCR 1244) and North Macedonia rank globally for dealing with construction permits: quality of building regulations?
- Kosovo (UNSCR 1244) ranks 1st and North Macedonia ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality of building regulations index evaluates the accessibility and transparency of building regulations. It has two components: (i) whether building regulations are easily accessible; and (ii) whether the requirements for obtaining a building permit are clearly specified. The index is computed based on the methodology in the DB16-20 studies.