Solomon Islands vs Taiwan, China: Dealing with construction permits: Quality of building regulations
Solomon Islands
2 DB16-20 methodology
in 2019
Taiwan, China
2 DB16-20 methodology
in 2019
Solomon Islands rank
1st
Taiwan, China rank
1st
Dealing with construction permits: Quality of building regulations over time
- Solomon Islands
- Taiwan, China
How they compare
Solomon Islands currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Taiwan, China, a difference of 0 DB16-20 methodology.
Across all 6 years both countries report, Taiwan, China has been ahead every year.
Solomon Islands ranks 1st and Taiwan, China ranks 1st of 186 countries.
Taiwan, China has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality of building regulations, Solomon Islands or Taiwan, China?
- Solomon Islands, at 2 DB16-20 methodology against 2 DB16-20 methodology in Taiwan, China as of 2019.
- What is the difference in dealing with construction permits: quality of building regulations between Solomon Islands and Taiwan, China?
- 0 DB16-20 methodology, with Solomon Islands ahead.
- How many years of comparable data are there for Solomon Islands and Taiwan, China?
- 6 years are reported by both, from 2014 to 2019.
- How do Solomon Islands and Taiwan, China rank globally for dealing with construction permits: quality of building regulations?
- Solomon Islands ranks 1st and Taiwan, China ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality of building regulations index evaluates the accessibility and transparency of building regulations. It has two components: (i) whether building regulations are easily accessible; and (ii) whether the requirements for obtaining a building permit are clearly specified. The index is computed based on the methodology in the DB16-20 studies.