Trinidad and Tobago vs Uruguay: Dealing with construction permits: Quality of building regulations
Trinidad and Tobago
2 DB16-20 methodology
in 2019
Uruguay
2 DB16-20 methodology
in 2019
Trinidad and Tobago rank
1st
Uruguay rank
1st
Dealing with construction permits: Quality of building regulations over time
- Trinidad and Tobago
- Uruguay
How they compare
Trinidad and Tobago currently reports 2 DB16-20 methodology against 2 DB16-20 methodology in Uruguay, a difference of 0 DB16-20 methodology.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was Trinidad and Tobago ahead.
Trinidad and Tobago ranks 1st and Uruguay ranks 1st of 186 countries.
Trinidad and Tobago has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher dealing with construction permits: quality of building regulations, Trinidad and Tobago or Uruguay?
- Trinidad and Tobago, at 2 DB16-20 methodology against 2 DB16-20 methodology in Uruguay as of 2019.
- What is the difference in dealing with construction permits: quality of building regulations between Trinidad and Tobago and Uruguay?
- 0 DB16-20 methodology, with Trinidad and Tobago ahead.
- How many years of comparable data are there for Trinidad and Tobago and Uruguay?
- 6 years are reported by both, from 2014 to 2019.
- How do Trinidad and Tobago and Uruguay rank globally for dealing with construction permits: quality of building regulations?
- Trinidad and Tobago ranks 1st and Uruguay ranks 1st of 186 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Quality of building regulations index (0-2) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The quality of building regulations index evaluates the accessibility and transparency of building regulations. It has two components: (i) whether building regulations are easily accessible; and (ii) whether the requirements for obtaining a building permit are clearly specified. The index is computed based on the methodology in the DB16-20 studies.