Angola vs Tanzania: Dealing with construction permits: Time (days) - Score (Time days)
Angola
54.47
in 2019
Tanzania
54.47
in 2019
Angola rank
138th
Tanzania rank
138th
Dealing with construction permits: Time (days) - Score (Time days) over time
- Angola
- Tanzania
How they compare
Angola currently reports 54.47 against 54.47 in Tanzania, a difference of 0.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was Tanzania ahead.
Angola ranks 138th and Tanzania ranks 138th of 191 countries.
Across the 2 decades both report, Angola averaged higher in 1 and Tanzania in 1.
Head to head by decade
| Decade | Angola | Tanzania | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 20.06 | 45.24 | 25.19 | Tanzania |
| 2010s | 48.41 | 45.79 | 2.62 | Angola |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time (days) - score, Angola or Tanzania?
- Angola, at 54.47 against 54.47 in Tanzania as of 2019.
- What is the difference in dealing with construction permits: time (days) - score between Angola and Tanzania?
- 0, with Angola ahead.
- How many years of comparable data are there for Angola and Tanzania?
- 15 years are reported by both, from 2005 to 2019.
- How do Angola and Tanzania rank globally for dealing with construction permits: time (days) - score?
- Angola ranks 138th and Tanzania ranks 138th of 191 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for time benchmarks economies with respect to the regulatory best practice on the indicator. The score ranges from 0 to 100, where 0 represents the worst regulatory performance and 100 the best regulatory performance.