Haiti vs Rwanda: Dealing with construction permits: Time

Haiti
97 days
in 2019
Rwanda
97 days
in 2019
Haiti rank
146th
Rwanda rank
146th

Dealing with construction permits: Time over time

  • Haiti
  • Rwanda
50100150200250300200520122019

How they compare

Haiti currently reports 97 days against 97 days in Rwanda, a difference of 0 days.

Across all 15 years both countries report, Rwanda has been ahead every year.

Haiti ranks 146th and Rwanda ranks 146th of 185 countries.

Rwanda has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Haiti Rwanda Difference Ahead
2000s 121 days 227.2 days 106.2 days Rwanda
2010s 95.9 days 125.6 days 29.7 days Rwanda

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Haiti or Rwanda?
Haiti, at 97 days against 97 days in Rwanda as of 2019.
What is the difference in dealing with construction permits: time between Haiti and Rwanda?
0 days, with Haiti ahead.
How many years of comparable data are there for Haiti and Rwanda?
15 years are reported by both, from 2005 to 2019.
How do Haiti and Rwanda rank globally for dealing with construction permits: time?
Haiti ranks 146th and Rwanda ranks 146th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.