Japan vs Palestine, State of: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Japan
- Palestine, State of
How they compare
Japan currently reports 108.35 days against 108 days in Palestine, State of, a difference of 0.35 days.
The two have swapped places 2 times across 15 shared years of data; in 2005 it was Japan ahead.
Japan ranks 129th and Palestine, State of ranks 130th of 188 countries.
Across the 2 decades both report, Japan averaged higher in 1 and Palestine, State of in 1.
Head to head by decade
| Decade | Japan | Palestine, State of | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 170 days | 109 days | 61 days | Japan |
| 2010s | 108.25 days | 108.5 days | 0.255 days | Palestine, State of |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Japan or Palestine, State of?
- Japan, at 108.35 days against 108 days in Palestine, State of as of 2019.
- What is the difference in dealing with construction permits: time between Japan and Palestine, State of?
- 0.35 days, with Japan ahead.
- How many years of comparable data are there for Japan and Palestine, State of?
- 15 years are reported by both, from 2005 to 2019.
- How do Japan and Palestine, State of rank globally for dealing with construction permits: time?
- Japan ranks 129th and Palestine, State of ranks 130th of 188 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.