Mali vs Paraguay: Dealing with construction permits: Time (days) (Time days)

Mali
124 days
in 2019
Paraguay
121 days
in 2019
Mali rank
111th
Paraguay rank
114th

Dealing with construction permits: Time (days) (Time days) over time

  • Mali
  • Paraguay
0100200300200520122019

How they compare

Mali currently reports 124 days against 121 days in Paraguay, a difference of 3 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Paraguay ahead.

Mali ranks 111th and Paraguay ranks 114th of 188 countries.

Across the 2 decades both report, Mali averaged higher in 1 and Paraguay in 1.

Head to head by decade

Decade Mali Paraguay Difference Ahead
2000s 220.2 days 275 days 54.8 days Paraguay
2010s 140 days 125.2 days 14.8 days Mali

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Mali or Paraguay?
Mali, at 124 days against 121 days in Paraguay as of 2019.
What is the difference in dealing with construction permits: time between Mali and Paraguay?
3 days, with Mali ahead.
How many years of comparable data are there for Mali and Paraguay?
15 years are reported by both, from 2005 to 2019.
How do Mali and Paraguay rank globally for dealing with construction permits: time?
Mali ranks 111th and Paraguay ranks 114th of 188 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Mali vs Paraguay: Dealing with construction permits: Time. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mali/paraguay/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/dealing-with-construction-permits-time-days/mali/paraguay/">Mali vs Paraguay: Dealing with construction permits: Time</a> — Statizoid

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,751 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.