Marshall Islands vs Singapore: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Marshall Islands
- Singapore
How they compare
Marshall Islands currently reports 38 days against 35.5 days in Singapore, a difference of 2.5 days.
That makes Marshall Islands's figure about 1.1 times Singapore's.
The two have swapped places 3 times across 15 shared years of data; in 2005 it was Singapore ahead.
Marshall Islands ranks 183rd and Singapore ranks 184th of 185 countries.
Marshall Islands has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Marshall Islands | Singapore | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 53 days | 52.2 days | 0.8 days | Marshall Islands |
| 2010s | 41 days | 39.35 days | 1.65 days | Marshall Islands |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Marshall Islands or Singapore?
- Marshall Islands, at 38 days against 35.5 days in Singapore as of 2019.
- What is the difference in dealing with construction permits: time between Marshall Islands and Singapore?
- 2.5 days, with Marshall Islands ahead.
- How many years of comparable data are there for Marshall Islands and Singapore?
- 15 years are reported by both, from 2005 to 2019.
- How do Marshall Islands and Singapore rank globally for dealing with construction permits: time?
- Marshall Islands ranks 183rd and Singapore ranks 184th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.