Puerto Rico vs Russia: Dealing with construction permits: Time

Puerto Rico
165 days
in 2019
Russia
164.5 days
in 2019
Puerto Rico rank
64th
Russia rank
65th

Dealing with construction permits: Time over time

  • Puerto Rico
  • Russia
200400600200520122019

How they compare

Puerto Rico currently reports 165 days against 164.5 days in Russia, a difference of 0.5 days.

The two have swapped places 1 time across 15 shared years of data; in 2005 it was Russia ahead.

Puerto Rico ranks 64th and Russia ranks 65th of 185 countries.

Russia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Puerto Rico Russia Difference Ahead
2000s 175 days 666.8 days 491.8 days Russia
2010s 173.8 days 267.81 days 94.01 days Russia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher dealing with construction permits: time, Puerto Rico or Russia?
Puerto Rico, at 165 days against 164.5 days in Russia as of 2019.
What is the difference in dealing with construction permits: time between Puerto Rico and Russia?
0.5 days, with Puerto Rico ahead.
How many years of comparable data are there for Puerto Rico and Russia?
15 years are reported by both, from 2005 to 2019.
How do Puerto Rico and Russia rank globally for dealing with construction permits: time?
Puerto Rico ranks 64th and Russia ranks 65th of 185 countries.
Where does this data come from?
The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Dealing with construction permits: Time (days)
Unit
days
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 2,740 data points, 2005–2019
Last refreshed

The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.