Puerto Rico vs Russia: Dealing with construction permits: Time
Dealing with construction permits: Time over time
- Puerto Rico
- Russia
How they compare
Puerto Rico currently reports 165 days against 164.5 days in Russia, a difference of 0.5 days.
The two have swapped places 1 time across 15 shared years of data; in 2005 it was Russia ahead.
Puerto Rico ranks 64th and Russia ranks 65th of 185 countries.
Russia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Puerto Rico | Russia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 175 days | 666.8 days | 491.8 days | Russia |
| 2010s | 173.8 days | 267.81 days | 94.01 days | Russia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction permits: time, Puerto Rico or Russia?
- Puerto Rico, at 165 days against 164.5 days in Russia as of 2019.
- What is the difference in dealing with construction permits: time between Puerto Rico and Russia?
- 0.5 days, with Puerto Rico ahead.
- How many years of comparable data are there for Puerto Rico and Russia?
- 15 years are reported by both, from 2005 to 2019.
- How do Puerto Rico and Russia rank globally for dealing with construction permits: time?
- Puerto Rico ranks 64th and Russia ranks 65th of 185 countries.
- Where does this data come from?
- The World Bank, published as Dealing with construction permits: Time (days). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that local experts indicate is necessary to complete a procedure in practice. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to complete each procedure, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.