Algeria vs Sierra Leone: Dealing with construction, procedures
Dealing with construction, procedures over time
- Algeria
- Sierra Leone
How they compare
Sierra Leone currently reports 20 number against 19 number in Algeria, a difference of 1 number.
That makes Sierra Leone's figure about 1.1 times Algeria's.
Across all 8 years both countries report, Sierra Leone has been ahead every year.
Algeria ranks 7th and Sierra Leone ranks 6th of 50 countries.
Sierra Leone has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Algeria | Sierra Leone | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 19 number | 35 number | 16 number | Sierra Leone |
| 2010s | 19 number | 20 number | 1 number | Sierra Leone |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction, procedures, Algeria or Sierra Leone?
- Sierra Leone, at 20 number against 19 number in Algeria as of 2012.
- What is the difference in dealing with construction, procedures between Algeria and Sierra Leone?
- 1 number, with Sierra Leone ahead.
- How many years of comparable data are there for Algeria and Sierra Leone?
- 8 years are reported by both, from 2005 to 2012.
- How do Algeria and Sierra Leone rank globally for dealing with construction, procedures?
- Algeria ranks 7th and Sierra Leone ranks 6th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction, procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
A procedure is any interaction of the company’s employees or managers with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies, public and private inspectors and technical experts apart from in-house architects and engineers. Interactions between company employees, such as development of the warehouse plans and inspections conducted by employees, are not counted as procedures. Procedures that the company undergoes to connect to electricity, water, sewerage and phone services are included. All procedures that are legally or in practice required for building a warehouse are counted, even if they may be avoided in exceptional cases. For more information, visit http://www.doingbusiness.org/MethodologySurveys/.