Botswana vs North Africa: Dealing with construction, procedures
Dealing with construction, procedures over time
- Botswana
- North Africa
How they compare
Botswana currently reports 22 number against 17.6 number in North Africa, a difference of 4.4 number.
That makes Botswana's figure about 1.2 times North Africa's.
Across all 8 years both countries report, Botswana has been ahead every year.
Botswana ranks 3rd and North Africa ranks 1st of 50 countries.
Botswana has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Botswana | North Africa | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 21.8 number | 18.08 number | 3.72 number | Botswana |
| 2010s | 22 number | 17.6 number | 4.4 number | Botswana |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction, procedures, Botswana or North Africa?
- Botswana, at 22 number against 17.6 number in North Africa as of 2012.
- What is the difference in dealing with construction, procedures between Botswana and North Africa?
- 4.4 number, with Botswana ahead.
- How many years of comparable data are there for Botswana and North Africa?
- 8 years are reported by both, from 2005 to 2012.
- How do Botswana and North Africa rank globally for dealing with construction, procedures?
- Botswana ranks 3rd and North Africa ranks 1st of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction, procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
A procedure is any interaction of the company’s employees or managers with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies, public and private inspectors and technical experts apart from in-house architects and engineers. Interactions between company employees, such as development of the warehouse plans and inspections conducted by employees, are not counted as procedures. Procedures that the company undergoes to connect to electricity, water, sewerage and phone services are included. All procedures that are legally or in practice required for building a warehouse are counted, even if they may be avoided in exceptional cases. For more information, visit http://www.doingbusiness.org/MethodologySurveys/.