Equatorial Guinea vs Nigeria: Dealing with construction, procedures (number)
Dealing with construction, procedures (number) over time
- Equatorial Guinea
- Nigeria
How they compare
Equatorial Guinea currently reports 15 number against 15 number in Nigeria, a difference of 0 number.
Across all 8 years both countries report, Nigeria has been ahead every year.
Equatorial Guinea ranks 20th and Nigeria ranks 20th of 50 countries.
Nigeria has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Equatorial Guinea | Nigeria | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 15 number | 16.6 number | 1.6 number | Nigeria |
| 2010s | 15 number | 15 number | 0 number | — |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher dealing with construction, procedures, Equatorial Guinea or Nigeria?
- Equatorial Guinea, at 15 number against 15 number in Nigeria as of 2012.
- What is the difference in dealing with construction, procedures between Equatorial Guinea and Nigeria?
- 0 number, with Equatorial Guinea ahead.
- How many years of comparable data are there for Equatorial Guinea and Nigeria?
- 8 years are reported by both, from 2005 to 2012.
- How do Equatorial Guinea and Nigeria rank globally for dealing with construction, procedures?
- Equatorial Guinea ranks 20th and Nigeria ranks 20th of 50 countries.
- Where does this data come from?
- World Bank, Doing Business project (http://www.doingbusiness.org/), published as Dealing with construction, procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
A procedure is any interaction of the company’s employees or managers with external parties, including government agencies, notaries, the land registry, the cadastre, utility companies, public and private inspectors and technical experts apart from in-house architects and engineers. Interactions between company employees, such as development of the warehouse plans and inspections conducted by employees, are not counted as procedures. Procedures that the company undergoes to connect to electricity, water, sewerage and phone services are included. All procedures that are legally or in practice required for building a warehouse are counted, even if they may be avoided in exceptional cases. For more information, visit http://www.doingbusiness.org/MethodologySurveys/.