Bosnia and Herzegovina vs Poland: Getting electricity (DB10-15 methodology) - Score

Bosnia and Herzegovina
75.39
in 2014
Poland
74.65
in 2014
Bosnia and Herzegovina rank
87th
Poland rank
89th

Getting electricity (DB10-15 methodology) - Score over time

  • Bosnia and Herzegovina
  • Poland
020406080200920112014

How they compare

Bosnia and Herzegovina currently reports 75.39 against 74.65 in Poland, a difference of 0.74.

The two have swapped places 1 time across 6 shared years of data; in 2009 it was Poland ahead.

Bosnia and Herzegovina ranks 87th and Poland ranks 89th of 184 countries.

Across the 2 decades both report, Bosnia and Herzegovina averaged higher in 1 and Poland in 1.

Head to head by decade

Decade Bosnia and Herzegovina Poland Difference Ahead
2000s 53.4 61.42 8.01 Poland
2010s 75.35 66.74 8.61 Bosnia and Herzegovina

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity (db10-15 methodology) - score, Bosnia and Herzegovina or Poland?
Bosnia and Herzegovina, at 75.39 against 74.65 in Poland as of 2014.
What is the difference in getting electricity (db10-15 methodology) - score between Bosnia and Herzegovina and Poland?
0.74, with Bosnia and Herzegovina ahead.
How many years of comparable data are there for Bosnia and Herzegovina and Poland?
6 years are reported by both, from 2009 to 2014.
How do Bosnia and Herzegovina and Poland rank globally for getting electricity (db10-15 methodology) - score?
Bosnia and Herzegovina ranks 87th and Poland ranks 89th of 184 countries.
Where does this data come from?
The World Bank, published as Getting electricity (DB10-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bosnia and Herzegovina vs Poland: Getting electricity (DB10-15 methodology) - Score. Statizoid. Retrieved 03 September 2026, from https://private-sector.statizoid.com/compare/getting-electricity-db10-15-methodology-score/bosnia-and-herzegovina/poland/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-db10-15-methodology-score/bosnia-and-herzegovina/poland/">Bosnia and Herzegovina vs Poland: Getting electricity (DB10-15 methodology) - Score</a> — Statizoid

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
184 places, 1,104 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.