Congo, Dem. Rep. vs Liberia: Getting electricity (DB10-15 methodology) - Score

Congo, Dem. Rep.
44.64
in 2014
Liberia
46.18
in 2014
Congo, Dem. Rep. rank
170th
Liberia rank
167th

Getting electricity (DB10-15 methodology) - Score over time

  • Congo, Dem. Rep.
  • Liberia
01020304050200920112014

How they compare

Liberia currently reports 46.18 against 44.64 in Congo, Dem. Rep., a difference of 1.54.

The two have swapped places 1 time across 6 shared years of data; in 2009 it was Congo, Dem. Rep. ahead.

Congo, Dem. Rep. ranks 170th and Liberia ranks 167th of 181 countries.

Congo, Dem. Rep. has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Congo, Dem. Rep. Liberia Difference Ahead
2000s 37.97 28.18 9.79 Congo, Dem. Rep.
2010s 39.3 36.71 2.59 Congo, Dem. Rep.

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity (db10-15 methodology) - score, Congo, Dem. Rep. or Liberia?
Liberia, at 46.18 against 44.64 in Congo, Dem. Rep. as of 2014.
What is the difference in getting electricity (db10-15 methodology) - score between Congo, Dem. Rep. and Liberia?
1.54, with Liberia ahead.
How many years of comparable data are there for Congo, Dem. Rep. and Liberia?
6 years are reported by both, from 2009 to 2014.
How do Congo, Dem. Rep. and Liberia rank globally for getting electricity (db10-15 methodology) - score?
Congo, Dem. Rep. ranks 170th and Liberia ranks 167th of 181 countries.
Where does this data come from?
The World Bank, published as Getting electricity (DB10-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.