Congo, Rep. vs Ukraine: Getting electricity (DB10-15 methodology) - Score

Congo, Rep.
47.16
in 2014
Ukraine
51.92
in 2014
Congo, Rep. rank
165th
Ukraine rank
163rd

Getting electricity (DB10-15 methodology) - Score over time

  • Congo, Rep.
  • Ukraine
0204060200920112014

How they compare

Ukraine currently reports 51.92 against 47.16 in Congo, Rep., a difference of 4.76.

That makes Ukraine's figure about 1.1 times Congo, Rep.'s.

The two have swapped places 1 time across 6 shared years of data; in 2009 it was Congo, Rep. ahead.

Congo, Rep. ranks 165th and Ukraine ranks 163rd of 181 countries.

Congo, Rep. has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Congo, Rep. Ukraine Difference Ahead
2000s 42.96 32.25 10.71 Congo, Rep.
2010s 45.17 40.22 4.95 Congo, Rep.

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity (db10-15 methodology) - score, Congo, Rep. or Ukraine?
Ukraine, at 51.92 against 47.16 in Congo, Rep. as of 2014.
What is the difference in getting electricity (db10-15 methodology) - score between Congo, Rep. and Ukraine?
4.76, with Ukraine ahead.
How many years of comparable data are there for Congo, Rep. and Ukraine?
6 years are reported by both, from 2009 to 2014.
How do Congo, Rep. and Ukraine rank globally for getting electricity (db10-15 methodology) - score?
Congo, Rep. ranks 165th and Ukraine ranks 163rd of 181 countries.
Where does this data come from?
The World Bank, published as Getting electricity (DB10-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.