Equatorial Guinea vs Morocco: Getting electricity (DB10-15 methodology) - Score

Equatorial Guinea
73.84
in 2014
Morocco
74.39
in 2014
Equatorial Guinea rank
95th
Morocco rank
92nd

Getting electricity (DB10-15 methodology) - Score over time

  • Equatorial Guinea
  • Morocco
020406080200920112014

How they compare

Morocco currently reports 74.39 against 73.84 in Equatorial Guinea, a difference of 0.55.

The two have swapped places 2 times across 6 shared years of data; in 2009 it was Morocco ahead.

Equatorial Guinea ranks 95th and Morocco ranks 92nd of 181 countries.

Morocco has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Equatorial Guinea Morocco Difference Ahead
2000s 74.14 74.99 0.8505 Morocco
2010s 73.73 73.88 0.1551 Morocco

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity (db10-15 methodology) - score, Equatorial Guinea or Morocco?
Morocco, at 74.39 against 73.84 in Equatorial Guinea as of 2014.
What is the difference in getting electricity (db10-15 methodology) - score between Equatorial Guinea and Morocco?
0.55, with Morocco ahead.
How many years of comparable data are there for Equatorial Guinea and Morocco?
6 years are reported by both, from 2009 to 2014.
How do Equatorial Guinea and Morocco rank globally for getting electricity (db10-15 methodology) - score?
Equatorial Guinea ranks 95th and Morocco ranks 92nd of 181 countries.
Where does this data come from?
The World Bank, published as Getting electricity (DB10-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.