Equatorial Guinea vs Palau: Getting electricity (DB10-15 methodology) - Score

Equatorial Guinea
73.84
in 2014
Palau
73.04
in 2014
Equatorial Guinea rank
95th
Palau rank
98th

Getting electricity (DB10-15 methodology) - Score over time

  • Equatorial Guinea
  • Palau
020406080200920112014

How they compare

Equatorial Guinea currently reports 73.84 against 73.04 in Palau, a difference of 0.8.

The two have swapped places 2 times across 6 shared years of data; in 2009 it was Equatorial Guinea ahead.

Equatorial Guinea ranks 95th and Palau ranks 98th of 181 countries.

Equatorial Guinea has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Equatorial Guinea Palau Difference Ahead
2000s 74.14 72.97 1.17 Equatorial Guinea
2010s 73.73 72.92 0.8061 Equatorial Guinea

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity (db10-15 methodology) - score, Equatorial Guinea or Palau?
Equatorial Guinea, at 73.84 against 73.04 in Palau as of 2014.
What is the difference in getting electricity (db10-15 methodology) - score between Equatorial Guinea and Palau?
0.8, with Equatorial Guinea ahead.
How many years of comparable data are there for Equatorial Guinea and Palau?
6 years are reported by both, from 2009 to 2014.
How do Equatorial Guinea and Palau rank globally for getting electricity (db10-15 methodology) - score?
Equatorial Guinea ranks 95th and Palau ranks 98th of 181 countries.
Where does this data come from?
The World Bank, published as Getting electricity (DB10-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.