India vs Russian Federation: Getting electricity (DB10-15 methodology) - Score

India
68.28
in 2014
Russian Federation
70.52
in 2014
India rank
113th
Russian Federation rank
110th

Getting electricity (DB10-15 methodology) - Score over time

  • India
  • Russian Federation
20406080200920112014

How they compare

Russian Federation currently reports 70.52 against 68.28 in India, a difference of 2.24.

The two have swapped places 1 time across 6 shared years of data; in 2009 it was India ahead.

India ranks 113th and Russian Federation ranks 110th of 181 countries.

India has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade India Russian Federation Difference Ahead
2000s 71.93 17.01 54.91 India
2010s 70.47 41.97 28.49 India

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity (db10-15 methodology) - score, India or Russian Federation?
Russian Federation, at 70.52 against 68.28 in India as of 2014.
What is the difference in getting electricity (db10-15 methodology) - score between India and Russian Federation?
2.24, with Russian Federation ahead.
How many years of comparable data are there for India and Russian Federation?
6 years are reported by both, from 2009 to 2014.
How do India and Russian Federation rank globally for getting electricity (db10-15 methodology) - score?
India ranks 113th and Russian Federation ranks 110th of 181 countries.
Where does this data come from?
The World Bank, published as Getting electricity (DB10-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
183 places, 1,098 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.