Sao Tome and Principe vs Saudi Arabia: Getting electricity (DB10-15 methodology) - Score

Sao Tome and Principe
82.29
in 2014
Saudi Arabia
81.54
in 2014
Sao Tome and Principe rank
52nd
Saudi Arabia rank
54th

Getting electricity (DB10-15 methodology) - Score over time

  • Sao Tome and Principe
  • Saudi Arabia
020406080200920112014

How they compare

Sao Tome and Principe currently reports 82.29 against 81.54 in Saudi Arabia, a difference of 0.75.

The two have swapped places 1 time across 6 shared years of data; in 2009 it was Saudi Arabia ahead.

Sao Tome and Principe ranks 52nd and Saudi Arabia ranks 54th of 184 countries.

Across the 2 decades both report, Sao Tome and Principe averaged higher in 1 and Saudi Arabia in 1.

Head to head by decade

Decade Sao Tome and Principe Saudi Arabia Difference Ahead
2000s 81.25 81.57 0.3286 Saudi Arabia
2010s 81.95 81.54 0.4148 Sao Tome and Principe

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity (db10-15 methodology) - score, Sao Tome and Principe or Saudi Arabia?
Sao Tome and Principe, at 82.29 against 81.54 in Saudi Arabia as of 2014.
What is the difference in getting electricity (db10-15 methodology) - score between Sao Tome and Principe and Saudi Arabia?
0.75, with Sao Tome and Principe ahead.
How many years of comparable data are there for Sao Tome and Principe and Saudi Arabia?
6 years are reported by both, from 2009 to 2014.
How do Sao Tome and Principe and Saudi Arabia rank globally for getting electricity (db10-15 methodology) - score?
Sao Tome and Principe ranks 52nd and Saudi Arabia ranks 54th of 184 countries.
Where does this data come from?
The World Bank, published as Getting electricity (DB10-15 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Sao Tome and Principe vs Saudi Arabia: Getting electricity (DB10-15 methodology) - Score. Statizoid. Retrieved 30 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-db10-15-methodology-score/sao-tome-and-principe/saudi-arabia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-db10-15-methodology-score/sao-tome-and-principe/saudi-arabia/">Sao Tome and Principe vs Saudi Arabia: Getting electricity (DB10-15 methodology) - Score</a> — Statizoid

About this data

Indicator
Getting electricity (DB10-15 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
184 places, 1,104 data points, 2009–2014
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB10-15 studies.