Cambodia vs Lao PDR: Getting electricity (DB16-20 methodology) - Score
Cambodia
57.46
in 2019
Lao PDR
58.03
in 2019
Cambodia rank
144th
Lao PDR rank
142nd
Getting electricity (DB16-20 methodology) - Score over time
- Cambodia
- Lao PDR
How they compare
Lao PDR currently reports 58.03 against 57.46 in Cambodia, a difference of 0.57.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was Cambodia ahead.
Cambodia ranks 144th and Lao PDR ranks 142nd of 188 countries.
Cambodia has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher getting electricity (db16-20 methodology) - score, Cambodia or Lao PDR?
- Lao PDR, at 58.03 against 57.46 in Cambodia as of 2019.
- What is the difference in getting electricity (db16-20 methodology) - score between Cambodia and Lao PDR?
- 0.57, with Lao PDR ahead.
- How many years of comparable data are there for Cambodia and Lao PDR?
- 6 years are reported by both, from 2014 to 2019.
- How do Cambodia and Lao PDR rank globally for getting electricity (db16-20 methodology) - score?
- Cambodia ranks 144th and Lao PDR ranks 142nd of 188 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.