Hong Kong vs United Arab Emirates: Getting electricity (DB16-20 methodology) - Score

Hong Kong
99.34
in 2019
United Arab Emirates
100
in 2019
Hong Kong rank
3rd
United Arab Emirates rank
1st

Getting electricity (DB16-20 methodology) - Score over time

  • Hong Kong
  • United Arab Emirates
020406080100201420162019

How they compare

United Arab Emirates currently reports 100 against 99.34 in Hong Kong, a difference of 0.66.

The two have swapped places 2 times across 6 shared years of data; in 2014 it was United Arab Emirates ahead.

Hong Kong ranks 3rd and United Arab Emirates ranks 1st of 191 countries.

United Arab Emirates has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher getting electricity (db16-20 methodology) - score, Hong Kong or United Arab Emirates?
United Arab Emirates, at 100 against 99.34 in Hong Kong as of 2019.
What is the difference in getting electricity (db16-20 methodology) - score between Hong Kong and United Arab Emirates?
0.66, with United Arab Emirates ahead.
How many years of comparable data are there for Hong Kong and United Arab Emirates?
6 years are reported by both, from 2014 to 2019.
How do Hong Kong and United Arab Emirates rank globally for getting electricity (db16-20 methodology) - score?
Hong Kong ranks 3rd and United Arab Emirates ranks 1st of 191 countries.
Where does this data come from?
The World Bank, published as Getting electricity (DB16-20 methodology) - Score. Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Hong Kong vs United Arab Emirates: Getting electricity (DB16-20 methodology) - Score. Statizoid. Retrieved 31 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-db16-20-methodology-score/hong-kong-sar-china/united-arab-emirates/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-db16-20-methodology-score/hong-kong-sar-china/united-arab-emirates/">Hong Kong vs United Arab Emirates: Getting electricity (DB16-20 methodology) - Score</a> — Statizoid

About this data

Indicator
Getting electricity (DB16-20 methodology) - Score
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
191 places, 1,145 data points, 2014–2019
Last refreshed

The score for getting electricity is the simple average of the scores for each of the component indicators: the procedures, time, cost for a business to obtain a permanent electricity connection and supply for a standardized warehouse, as well as the reliability of supply and transparency of tariffs index. The score is computed based on the methodology in the DB16-20 studies.