Afghanistan vs Saint Lucia: Getting electricity: Procedures (number)

Afghanistan
6 number
in 2019
Saint Lucia
6 number
in 2019
Afghanistan rank
26th
Saint Lucia rank
26th

Getting electricity: Procedures (number) over time

  • Afghanistan
  • Saint Lucia
0246200920142019

How they compare

Afghanistan currently reports 6 number against 6 number in Saint Lucia, a difference of 0 number.

The two have swapped places 2 times across 11 shared years of data; in 2009 it was Saint Lucia ahead.

Afghanistan ranks 26th and Saint Lucia ranks 26th of 189 countries.

Across the 2 decades both report, Afghanistan averaged higher in 1 and Saint Lucia in 1.

Head to head by decade

Decade Afghanistan Saint Lucia Difference Ahead
2000s 4 number 5 number 1 number Saint Lucia
2010s 5.9 number 5.4 number 0.5 number Afghanistan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Afghanistan or Saint Lucia?
Afghanistan, at 6 number against 6 number in Saint Lucia as of 2019.
What is the difference in getting electricity: procedures between Afghanistan and Saint Lucia?
0 number, with Afghanistan ahead.
How many years of comparable data are there for Afghanistan and Saint Lucia?
11 years are reported by both, from 2009 to 2019.
How do Afghanistan and Saint Lucia rank globally for getting electricity: procedures?
Afghanistan ranks 26th and Saint Lucia ranks 26th of 189 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Afghanistan vs Saint Lucia: Getting electricity: Procedures. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/afghanistan/st-lucia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/afghanistan/st-lucia/">Afghanistan vs Saint Lucia: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
189 places, 2,056 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.