Algeria vs South Africa: Getting electricity: Procedures

Algeria
5 number
in 2019
South Africa
5 number
in 2019
Algeria rank
53rd
South Africa rank
53rd

Getting electricity: Procedures over time

  • Algeria
  • South Africa
012345200920142019

How they compare

Algeria currently reports 5 number against 5 number in South Africa, a difference of 0 number.

The two have swapped places 2 times across 11 shared years of data; in 2009 it was South Africa ahead.

Algeria ranks 53rd and South Africa ranks 53rd of 188 countries.

Algeria has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Algeria South Africa Difference Ahead
2000s 5 number 5 number 0 number
2010s 5 number 4.9 number 0.1 number Algeria

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Algeria or South Africa?
Algeria, at 5 number against 5 number in South Africa as of 2019.
What is the difference in getting electricity: procedures between Algeria and South Africa?
0 number, with Algeria ahead.
How many years of comparable data are there for Algeria and South Africa?
11 years are reported by both, from 2009 to 2019.
How do Algeria and South Africa rank globally for getting electricity: procedures?
Algeria ranks 53rd and South Africa ranks 53rd of 188 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Algeria vs South Africa: Getting electricity: Procedures. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/algeria/south-africa/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/algeria/south-africa/">Algeria vs South Africa: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.