Austria vs South Africa: Getting electricity: Procedures

Austria
5 number
in 2019
South Africa
5 number
in 2019
Austria rank
52nd
South Africa rank
52nd

Getting electricity: Procedures over time

  • Austria
  • South Africa
012345200920142019

How they compare

Austria currently reports 5 number against 5 number in South Africa, a difference of 0 number.

The two have swapped places 2 times across 11 shared years of data; in 2009 it was South Africa ahead.

Austria ranks 52nd and South Africa ranks 52nd of 186 countries.

Austria has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Austria South Africa Difference Ahead
2000s 5 number 5 number 0 number
2010s 5 number 4.9 number 0.1 number Austria

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Austria or South Africa?
Austria, at 5 number against 5 number in South Africa as of 2019.
What is the difference in getting electricity: procedures between Austria and South Africa?
0 number, with Austria ahead.
How many years of comparable data are there for Austria and South Africa?
11 years are reported by both, from 2009 to 2019.
How do Austria and South Africa rank globally for getting electricity: procedures?
Austria ranks 52nd and South Africa ranks 52nd of 186 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.