Azerbaijan vs New Zealand: Getting electricity: Procedures

Azerbaijan
5 number
in 2019
New Zealand
5 number
in 2019
Azerbaijan rank
53rd
New Zealand rank
53rd

Getting electricity: Procedures over time

  • Azerbaijan
  • New Zealand
02468200920142019

How they compare

Azerbaijan currently reports 5 number against 5 number in New Zealand, a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Azerbaijan ahead.

Azerbaijan ranks 53rd and New Zealand ranks 53rd of 188 countries.

Azerbaijan has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Azerbaijan New Zealand Difference Ahead
2000s 7 number 5 number 2 number Azerbaijan
2010s 6.8 number 5 number 1.8 number Azerbaijan

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Azerbaijan or New Zealand?
Azerbaijan, at 5 number against 5 number in New Zealand as of 2019.
What is the difference in getting electricity: procedures between Azerbaijan and New Zealand?
0 number, with Azerbaijan ahead.
How many years of comparable data are there for Azerbaijan and New Zealand?
11 years are reported by both, from 2009 to 2019.
How do Azerbaijan and New Zealand rank globally for getting electricity: procedures?
Azerbaijan ranks 53rd and New Zealand ranks 53rd of 188 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Azerbaijan vs New Zealand: Getting electricity: Procedures. Statizoid. Retrieved 17 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/azerbaijan/new-zealand/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/azerbaijan/new-zealand/">Azerbaijan vs New Zealand: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.