Bosnia and Herzegovina vs Grenada: Getting electricity: Procedures

Bosnia and Herzegovina
5 number
in 2019
Grenada
5 number
in 2019
Bosnia and Herzegovina rank
54th
Grenada rank
54th

Getting electricity: Procedures over time

  • Bosnia and Herzegovina
  • Grenada
02468200920142019

How they compare

Bosnia and Herzegovina currently reports 5 number against 5 number in Grenada, a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Bosnia and Herzegovina ahead.

Bosnia and Herzegovina ranks 54th and Grenada ranks 54th of 189 countries.

Bosnia and Herzegovina has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Bosnia and Herzegovina Grenada Difference Ahead
2000s 8 number 5 number 3 number Bosnia and Herzegovina
2010s 5 number 5 number 0 number

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Bosnia and Herzegovina or Grenada?
Bosnia and Herzegovina, at 5 number against 5 number in Grenada as of 2019.
What is the difference in getting electricity: procedures between Bosnia and Herzegovina and Grenada?
0 number, with Bosnia and Herzegovina ahead.
How many years of comparable data are there for Bosnia and Herzegovina and Grenada?
11 years are reported by both, from 2009 to 2019.
How do Bosnia and Herzegovina and Grenada rank globally for getting electricity: procedures?
Bosnia and Herzegovina ranks 54th and Grenada ranks 54th of 189 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bosnia and Herzegovina vs Grenada: Getting electricity: Procedures. Statizoid. Retrieved 24 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/bosnia-and-herzegovina/grenada/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/bosnia-and-herzegovina/grenada/">Bosnia and Herzegovina vs Grenada: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
189 places, 2,056 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.