Botswana vs Costa Rica: Getting electricity: Procedures (number)

Botswana
5 number
in 2019
Costa Rica
5 number
in 2019
Botswana rank
54th
Costa Rica rank
54th

Getting electricity: Procedures (number) over time

  • Botswana
  • Costa Rica
012345200920142019

How they compare

Botswana currently reports 5 number against 5 number in Costa Rica, a difference of 0 number.

Across all 11 years both countries report, Costa Rica has been ahead every year.

Botswana ranks 54th and Costa Rica ranks 54th of 189 countries.

Head to head by decade

Decade Botswana Costa Rica Difference Ahead
2000s 5 number 5 number 0 number —
2010s 5 number 5 number 0 number —

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Botswana or Costa Rica?
Botswana, at 5 number against 5 number in Costa Rica as of 2019.
What is the difference in getting electricity: procedures between Botswana and Costa Rica?
0 number, with Botswana ahead.
How many years of comparable data are there for Botswana and Costa Rica?
11 years are reported by both, from 2009 to 2019.
How do Botswana and Costa Rica rank globally for getting electricity: procedures?
Botswana ranks 54th and Costa Rica ranks 54th of 189 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Botswana vs Costa Rica: Getting electricity: Procedures. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/botswana/costa-rica/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/botswana/costa-rica/">Botswana vs Costa Rica: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
189 places, 2,056 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.