Brunei Darussalam vs Costa Rica: Getting electricity: Procedures

Brunei Darussalam
5 number
in 2019
Costa Rica
5 number
in 2019
Brunei Darussalam rank
53rd
Costa Rica rank
53rd

Getting electricity: Procedures over time

  • Brunei Darussalam
  • Costa Rica
0246200920142019

How they compare

Brunei Darussalam currently reports 5 number against 5 number in Costa Rica, a difference of 0 number.

The two have swapped places 3 times across 11 shared years of data; in 2009 it was Brunei Darussalam ahead.

Brunei Darussalam ranks 53rd and Costa Rica ranks 53rd of 188 countries.

Brunei Darussalam has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Brunei Darussalam Costa Rica Difference Ahead
2000s 6 number 5 number 1 number Brunei Darussalam
2010s 5.7 number 5 number 0.7 number Brunei Darussalam

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Brunei Darussalam or Costa Rica?
Brunei Darussalam, at 5 number against 5 number in Costa Rica as of 2019.
What is the difference in getting electricity: procedures between Brunei Darussalam and Costa Rica?
0 number, with Brunei Darussalam ahead.
How many years of comparable data are there for Brunei Darussalam and Costa Rica?
11 years are reported by both, from 2009 to 2019.
How do Brunei Darussalam and Costa Rica rank globally for getting electricity: procedures?
Brunei Darussalam ranks 53rd and Costa Rica ranks 53rd of 188 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brunei Darussalam vs Costa Rica: Getting electricity: Procedures. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/brunei-darussalam/costa-rica/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/brunei-darussalam/costa-rica/">Brunei Darussalam vs Costa Rica: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.