Brunei Darussalam vs Palestine, State of: Getting electricity: Procedures

Brunei Darussalam
5 number
in 2019
Palestine, State of
5 number
in 2019
Brunei Darussalam rank
54th
Palestine, State of rank
54th

Getting electricity: Procedures over time

  • Brunei Darussalam
  • Palestine, State of
0246200920142019

How they compare

Brunei Darussalam currently reports 5 number against 5 number in Palestine, State of, a difference of 0 number.

The two have swapped places 3 times across 11 shared years of data; in 2009 it was Brunei Darussalam ahead.

Brunei Darussalam ranks 54th and Palestine, State of ranks 54th of 189 countries.

Brunei Darussalam has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Brunei Darussalam Palestine, State of Difference Ahead
2000s 6 number 5 number 1 number Brunei Darussalam
2010s 5.7 number 5 number 0.7 number Brunei Darussalam

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Brunei Darussalam or Palestine, State of?
Brunei Darussalam, at 5 number against 5 number in Palestine, State of as of 2019.
What is the difference in getting electricity: procedures between Brunei Darussalam and Palestine, State of?
0 number, with Brunei Darussalam ahead.
How many years of comparable data are there for Brunei Darussalam and Palestine, State of?
11 years are reported by both, from 2009 to 2019.
How do Brunei Darussalam and Palestine, State of rank globally for getting electricity: procedures?
Brunei Darussalam ranks 54th and Palestine, State of ranks 54th of 189 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Brunei Darussalam vs Palestine, State of: Getting electricity: Procedures. Statizoid. Retrieved 31 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/brunei-darussalam/west-bank-and-gaza/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/brunei-darussalam/west-bank-and-gaza/">Brunei Darussalam vs Palestine, State of: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
189 places, 2,056 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.