Cabo Verde vs St. Lucia: Getting electricity: Procedures
Getting electricity: Procedures over time
- Cabo Verde
- St. Lucia
How they compare
Cabo Verde currently reports 6 number against 6 number in St. Lucia, a difference of 0 number.
The two have swapped places 1 time across 11 shared years of data; in 2009 it was Cabo Verde ahead.
Cabo Verde ranks 24th and St. Lucia ranks 24th of 186 countries.
Cabo Verde has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Cabo Verde | St. Lucia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 7 number | 5 number | 2 number | Cabo Verde |
| 2010s | 6.9 number | 5.4 number | 1.5 number | Cabo Verde |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher getting electricity: procedures, Cabo Verde or St. Lucia?
- Cabo Verde, at 6 number against 6 number in St. Lucia as of 2019.
- What is the difference in getting electricity: procedures between Cabo Verde and St. Lucia?
- 0 number, with Cabo Verde ahead.
- How many years of comparable data are there for Cabo Verde and St. Lucia?
- 11 years are reported by both, from 2009 to 2019.
- How do Cabo Verde and St. Lucia rank globally for getting electricity: procedures?
- Cabo Verde ranks 24th and St. Lucia ranks 24th of 186 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.