Congo, Rep. vs Iran, Islamic Rep.: Getting electricity: Procedures
Getting electricity: Procedures over time
- Congo, Rep.
- Iran, Islamic Rep.
How they compare
Congo, Rep. currently reports 6 number against 6 number in Iran, Islamic Rep., a difference of 0 number.
Across all 11 years both countries report, Iran, Islamic Rep. has been ahead every year.
Congo, Rep. ranks 24th and Iran, Islamic Rep. ranks 24th of 186 countries.
Iran, Islamic Rep. has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Congo, Rep. | Iran, Islamic Rep. | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 6 number | 7 number | 1 number | Iran, Islamic Rep. |
| 2010s | 6 number | 6.4 number | 0.4 number | Iran, Islamic Rep. |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher getting electricity: procedures, Congo, Rep. or Iran, Islamic Rep.?
- Congo, Rep., at 6 number against 6 number in Iran, Islamic Rep. as of 2019.
- What is the difference in getting electricity: procedures between Congo, Rep. and Iran, Islamic Rep.?
- 0 number, with Congo, Rep. ahead.
- How many years of comparable data are there for Congo, Rep. and Iran, Islamic Rep.?
- 11 years are reported by both, from 2009 to 2019.
- How do Congo, Rep. and Iran, Islamic Rep. rank globally for getting electricity: procedures?
- Congo, Rep. ranks 24th and Iran, Islamic Rep. ranks 24th of 186 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.