Georgia vs Hong Kong: Getting electricity: Procedures (number)

Georgia
3 number
in 2019
Hong Kong
3 number
in 2019
Georgia rank
162nd
Hong Kong rank
162nd

Getting electricity: Procedures (number) over time

  • Georgia
  • Hong Kong
012345200920142019

How they compare

Georgia currently reports 3 number against 3 number in Hong Kong, a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Georgia ahead.

Georgia ranks 162nd and Hong Kong ranks 162nd of 189 countries.

Across the 2 decades both report, Georgia averaged higher in 1 and Hong Kong in 1.

Head to head by decade

Decade Georgia Hong Kong Difference Ahead
2000s 5 number 4 number 1 number Georgia
2010s 3.4 number 3.6 number 0.2 number Hong Kong

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Georgia or Hong Kong?
Georgia, at 3 number against 3 number in Hong Kong as of 2019.
What is the difference in getting electricity: procedures between Georgia and Hong Kong?
0 number, with Georgia ahead.
How many years of comparable data are there for Georgia and Hong Kong?
11 years are reported by both, from 2009 to 2019.
How do Georgia and Hong Kong rank globally for getting electricity: procedures?
Georgia ranks 162nd and Hong Kong ranks 162nd of 189 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Georgia vs Hong Kong: Getting electricity: Procedures. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/georgia/hong-kong-sar-china/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/georgia/hong-kong-sar-china/">Georgia vs Hong Kong: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
189 places, 2,056 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.