Hong Kong vs Malaysia: Getting electricity: Procedures (number)
Getting electricity: Procedures (number) over time
- Hong Kong
- Malaysia
How they compare
Hong Kong currently reports 3 number against 3 number in Malaysia, a difference of 0 number.
Across all 11 years both countries report, Malaysia has been ahead every year.
Hong Kong ranks 162nd and Malaysia ranks 162nd of 189 countries.
Malaysia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Hong Kong | Malaysia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 4 number | 4 number | 0 number | — |
| 2010s | 3.6 number | 3.8 number | 0.2 number | Malaysia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher getting electricity: procedures, Hong Kong or Malaysia?
- Hong Kong, at 3 number against 3 number in Malaysia as of 2019.
- What is the difference in getting electricity: procedures between Hong Kong and Malaysia?
- 0 number, with Hong Kong ahead.
- How many years of comparable data are there for Hong Kong and Malaysia?
- 11 years are reported by both, from 2009 to 2019.
- How do Hong Kong and Malaysia rank globally for getting electricity: procedures?
- Hong Kong ranks 162nd and Malaysia ranks 162nd of 189 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.