Japan vs Russia: Getting electricity: Procedures (number)

Japan
2.35 number
in 2019
Russia
2 number
in 2019
Japan rank
183rd
Russia rank
184th

Getting electricity: Procedures (number) over time

  • Japan
  • Russia
246810200920142019

How they compare

Japan currently reports 2.35 number against 2 number in Russia, a difference of 0.35 number.

That makes Japan's figure about 1.2 times Russia's.

The two have swapped places 3 times across 11 shared years of data; in 2009 it was Russia ahead.

Japan ranks 183rd and Russia ranks 184th of 189 countries.

Russia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Japan Russia Difference Ahead
2000s 3 number 10 number 7 number Russia
2010s 2.91 number 5.1 number 2.19 number Russia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Japan or Russia?
Japan, at 2.35 number against 2 number in Russia as of 2019.
What is the difference in getting electricity: procedures between Japan and Russia?
0.35 number, with Japan ahead.
How many years of comparable data are there for Japan and Russia?
11 years are reported by both, from 2009 to 2019.
How do Japan and Russia rank globally for getting electricity: procedures?
Japan ranks 183rd and Russia ranks 184th of 189 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Japan vs Russia: Getting electricity: Procedures. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/japan/russian-federation/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/japan/russian-federation/">Japan vs Russia: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
189 places, 2,056 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.