Malaysia vs North Macedonia: Getting electricity: Procedures
Getting electricity: Procedures over time
- Malaysia
- North Macedonia
How they compare
Malaysia currently reports 3 number against 3 number in North Macedonia, a difference of 0 number.
The two have swapped places 2 times across 11 shared years of data; in 2009 it was North Macedonia ahead.
Malaysia ranks 159th and North Macedonia ranks 159th of 186 countries.
Malaysia has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Malaysia | North Macedonia | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 4 number | 4 number | 0 number | — |
| 2010s | 3.8 number | 3.4 number | 0.4 number | Malaysia |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher getting electricity: procedures, Malaysia or North Macedonia?
- Malaysia, at 3 number against 3 number in North Macedonia as of 2019.
- What is the difference in getting electricity: procedures between Malaysia and North Macedonia?
- 0 number, with Malaysia ahead.
- How many years of comparable data are there for Malaysia and North Macedonia?
- 11 years are reported by both, from 2009 to 2019.
- How do Malaysia and North Macedonia rank globally for getting electricity: procedures?
- Malaysia ranks 159th and North Macedonia ranks 159th of 186 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.