Malaysia vs St. Vincent and the Grenadines: Getting electricity: Procedures

Malaysia
3 number
in 2019
St. Vincent and the Grenadines
3 number
in 2019
Malaysia rank
161st
St. Vincent and the Grenadines rank
161st

Getting electricity: Procedures over time

  • Malaysia
  • St. Vincent and the Grenadines
01234200920142019

How they compare

Malaysia currently reports 3 number against 3 number in St. Vincent and the Grenadines, a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Malaysia ahead.

Malaysia ranks 161st and St. Vincent and the Grenadines ranks 161st of 188 countries.

Malaysia has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Malaysia St. Vincent and the Grenadines Difference Ahead
2000s 4 number 3 number 1 number Malaysia
2010s 3.8 number 3 number 0.8 number Malaysia

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Malaysia or St. Vincent and the Grenadines?
Malaysia, at 3 number against 3 number in St. Vincent and the Grenadines as of 2019.
What is the difference in getting electricity: procedures between Malaysia and St. Vincent and the Grenadines?
0 number, with Malaysia ahead.
How many years of comparable data are there for Malaysia and St. Vincent and the Grenadines?
11 years are reported by both, from 2009 to 2019.
How do Malaysia and St. Vincent and the Grenadines rank globally for getting electricity: procedures?
Malaysia ranks 161st and St. Vincent and the Grenadines ranks 161st of 188 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Malaysia vs St. Vincent and the Grenadines: Getting electricity: Procedures. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/malaysia/st-vincent-and-the-grenadines/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/malaysia/st-vincent-and-the-grenadines/">Malaysia vs St. Vincent and the Grenadines: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.