Moldova vs Peru: Getting electricity: Procedures

Moldova
6 number
in 2019
Peru
6 number
in 2019
Moldova rank
24th
Peru rank
24th

Getting electricity: Procedures over time

  • Moldova
  • Peru
02468200920142019

How they compare

Moldova currently reports 6 number against 6 number in Peru, a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Moldova ahead.

Moldova ranks 24th and Peru ranks 24th of 186 countries.

Moldova has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Moldova Peru Difference Ahead
2000s 8 number 6 number 2 number Moldova
2010s 6.6 number 6 number 0.6 number Moldova

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Moldova or Peru?
Moldova, at 6 number against 6 number in Peru as of 2019.
What is the difference in getting electricity: procedures between Moldova and Peru?
0 number, with Moldova ahead.
How many years of comparable data are there for Moldova and Peru?
11 years are reported by both, from 2009 to 2019.
How do Moldova and Peru rank globally for getting electricity: procedures?
Moldova ranks 24th and Peru ranks 24th of 186 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.