Poland vs Saint Kitts and Nevis: Getting electricity: Procedures

Poland
4 number
in 2019
Saint Kitts and Nevis
4 number
in 2019
Poland rank
113th
Saint Kitts and Nevis rank
113th

Getting electricity: Procedures over time

  • Poland
  • Saint Kitts and Nevis
0246200920142019

How they compare

Poland currently reports 4 number against 4 number in Saint Kitts and Nevis, a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Poland ahead.

Poland ranks 113th and Saint Kitts and Nevis ranks 113th of 186 countries.

Poland has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Poland Saint Kitts and Nevis Difference Ahead
2000s 6 number 4 number 2 number Poland
2010s 4.6 number 4 number 0.6 number Poland

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Poland or Saint Kitts and Nevis?
Poland, at 4 number against 4 number in Saint Kitts and Nevis as of 2019.
What is the difference in getting electricity: procedures between Poland and Saint Kitts and Nevis?
0 number, with Poland ahead.
How many years of comparable data are there for Poland and Saint Kitts and Nevis?
11 years are reported by both, from 2009 to 2019.
How do Poland and Saint Kitts and Nevis rank globally for getting electricity: procedures?
Poland ranks 113th and Saint Kitts and Nevis ranks 113th of 186 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
188 places, 2,045 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.