Poland vs Tunisia: Getting electricity: Procedures (number)

Poland
4 number
in 2019
Tunisia
4 number
in 2019
Poland rank
115th
Tunisia rank
115th

Getting electricity: Procedures (number) over time

  • Poland
  • Tunisia
0246200920142019

How they compare

Poland currently reports 4 number against 4 number in Tunisia, a difference of 0 number.

The two have swapped places 1 time across 11 shared years of data; in 2009 it was Poland ahead.

Poland ranks 115th and Tunisia ranks 115th of 189 countries.

Poland has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Poland Tunisia Difference Ahead
2000s 6 number 4 number 2 number Poland
2010s 4.6 number 4 number 0.6 number Poland

Averages of every year both report within each decade.

Frequently asked questions

Which has higher getting electricity: procedures, Poland or Tunisia?
Poland, at 4 number against 4 number in Tunisia as of 2019.
What is the difference in getting electricity: procedures between Poland and Tunisia?
0 number, with Poland ahead.
How many years of comparable data are there for Poland and Tunisia?
11 years are reported by both, from 2009 to 2019.
How do Poland and Tunisia rank globally for getting electricity: procedures?
Poland ranks 115th and Tunisia ranks 115th of 189 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Poland vs Tunisia: Getting electricity: Procedures. Statizoid. Retrieved 07 October 2026, from https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/poland/tunisia/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-procedures-number/poland/tunisia/">Poland vs Tunisia: Getting electricity: Procedures</a> — Statizoid

About this data

Indicator
Getting electricity: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
189 places, 2,056 data points, 2009–2019
Last refreshed

The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.