South Africa vs Syria: Getting electricity: Procedures (number)
Getting electricity: Procedures (number) over time
- South Africa
- Syria
How they compare
South Africa currently reports 5 number against 5 number in Syria, a difference of 0 number.
Across all 11 years both countries report, Syria has been ahead every year.
South Africa ranks 54th and Syria ranks 54th of 189 countries.
Syria has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | South Africa | Syria | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 5 number | 5 number | 0 number | — |
| 2010s | 4.9 number | 5 number | 0.1 number | Syria |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher getting electricity: procedures, South Africa or Syria?
- South Africa, at 5 number against 5 number in Syria as of 2019.
- What is the difference in getting electricity: procedures between South Africa and Syria?
- 0 number, with South Africa ahead.
- How many years of comparable data are there for South Africa and Syria?
- 11 years are reported by both, from 2009 to 2019.
- How do South Africa and Syria rank globally for getting electricity: procedures?
- South Africa ranks 54th and Syria ranks 54th of 189 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The number of procedures records all the procedures required in practice for businesses to obtain a new electrical connection. A procedure is defined as any interaction of the company’s employees or its main electrician or electrical engineer with external parties, such as the electricity distribution utility, electricity supply utilities, government agencies, electrical contractors and firms. Interactions between company employees and steps related to the internal electrical wiring, such as the design and execution of the internal electrical installation plans, are not counted as procedures. However, internal wiring inspections and certifications that are prerequisites to obtain a new connection are counted as procedures.