Antigua and Barbuda vs Norway: Getting electricity: System average interruption duration
Antigua and Barbuda
1.5 DB16-20 methodology
in 2019
Norway
1.5 DB16-20 methodology
in 2019
Antigua and Barbuda rank
70th
Norway rank
70th
Getting electricity: System average interruption duration over time
- Antigua and Barbuda
- Norway
How they compare
Antigua and Barbuda currently reports 1.5 DB16-20 methodology against 1.5 DB16-20 methodology in Norway, a difference of 0 DB16-20 methodology.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was Antigua and Barbuda ahead.
Antigua and Barbuda ranks 70th and Norway ranks 70th of 127 countries.
Antigua and Barbuda has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher getting electricity: system average interruption duration index, Antigua and Barbuda or Norway?
- Antigua and Barbuda, at 1.5 DB16-20 methodology against 1.5 DB16-20 methodology in Norway as of 2019.
- What is the difference in getting electricity: system average interruption duration index between Antigua and Barbuda and Norway?
- 0 DB16-20 methodology, with Antigua and Barbuda ahead.
- How many years of comparable data are there for Antigua and Barbuda and Norway?
- 6 years are reported by both, from 2014 to 2019.
- How do Antigua and Barbuda and Norway rank globally for getting electricity: system average interruption duration index?
- Antigua and Barbuda ranks 70th and Norway ranks 70th of 127 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The system average interruption duration index is the average total duration of outages (in hours) experienced by a customer in a year. The index is computed based on the methodology in the DB16-20 studies.