Namibia vs Spain: Getting electricity: System average interruption duration
Namibia
0.49 DB16-20 methodology
in 2019
Spain
0.51 DB16-20 methodology
in 2019
Namibia rank
101st
Spain rank
98th
Getting electricity: System average interruption duration over time
- Namibia
- Spain
How they compare
Spain currently reports 0.51 DB16-20 methodology against 0.49 DB16-20 methodology in Namibia, a difference of 0.02 DB16-20 methodology.
The two have swapped places 1 time across 6 shared years of data; in 2014 it was Namibia ahead.
Namibia ranks 101st and Spain ranks 98th of 127 countries.
Namibia has averaged higher in every one of the 1 decades both report.
Frequently asked questions
- Which has higher getting electricity: system average interruption duration index, Namibia or Spain?
- Spain, at 0.51 DB16-20 methodology against 0.49 DB16-20 methodology in Namibia as of 2019.
- What is the difference in getting electricity: system average interruption duration index between Namibia and Spain?
- 0.02 DB16-20 methodology, with Spain ahead.
- How many years of comparable data are there for Namibia and Spain?
- 6 years are reported by both, from 2014 to 2019.
- How do Namibia and Spain rank globally for getting electricity: system average interruption duration index?
- Namibia ranks 101st and Spain ranks 98th of 127 countries.
- Where does this data come from?
- The World Bank, published as Getting electricity: System average interruption duration index (SAIDI) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The system average interruption duration index is the average total duration of outages (in hours) experienced by a customer in a year. The index is computed based on the methodology in the DB16-20 studies.