Bolivia, Plurinational State of vs Grenada: Getting electricity: Total duration and frequency of outages per

Bolivia, Plurinational State of
1 DB16-20 methodology
in 2019
Grenada
1 DB16-20 methodology
in 2019
Bolivia, Plurinational State of rank
82nd
Grenada rank
82nd

Getting electricity: Total duration and frequency of outages per over time

  • Bolivia, Plurinational State of
  • Grenada
00.511.52201420162019

How they compare

Bolivia, Plurinational State of currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Grenada, a difference of 0 DB16-20 methodology.

Across all 6 years both countries report, Grenada has been ahead every year.

Bolivia, Plurinational State of ranks 82nd and Grenada ranks 82nd of 187 countries.

Grenada has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher getting electricity: total duration and frequency of outages per, Bolivia, Plurinational State of or Grenada?
Bolivia, Plurinational State of, at 1 DB16-20 methodology against 1 DB16-20 methodology in Grenada as of 2019.
What is the difference in getting electricity: total duration and frequency of outages per between Bolivia, Plurinational State of and Grenada?
0 DB16-20 methodology, with Bolivia, Plurinational State of ahead.
How many years of comparable data are there for Bolivia, Plurinational State of and Grenada?
6 years are reported by both, from 2014 to 2019.
How do Bolivia, Plurinational State of and Grenada rank globally for getting electricity: total duration and frequency of outages per?
Bolivia, Plurinational State of ranks 82nd and Grenada ranks 82nd of 187 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Total duration and frequency of outages per customer a year (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Bolivia, Plurinational State of vs Grenada: Getting electricity: Total duration and frequency of outages per. Statizoid. Retrieved 05 September 2026, from https://private-sector.statizoid.com/compare/getting-electricity-total-duration-and-frequency-of-outages-per-customer-a-year-0-3-db16/bolivia/grenada/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-total-duration-and-frequency-of-outages-per-customer-a-year-0-3-db16/bolivia/grenada/">Bolivia, Plurinational State of vs Grenada: Getting electricity: Total duration and frequency of outages per</a> — Statizoid

About this data

Indicator
Getting electricity: Total duration and frequency of outages per customer a year (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 1,122 data points, 2014–2019
Last refreshed

The total duration and frequency of outages per customer a year index evaluates the quality of the power supply. If SAIDI and SAIFI are 12 (equivalent to an outage of one hour each month) or below, a score of 1 is assigned. If SAIDI and SAIFI are 4 (equivalent to an outage of one hour each quarter) or below, 1 additional point is assigned. If SAIDI and SAIFI are 1 (equivalent to an outage of one hour per year) or below, 1 more point is assigned. The index is computed based on the methodology in the DB16-20 studies.