Georgia vs Trinidad and Tobago: Getting electricity: Total duration and frequency of outages per

Georgia
1 DB16-20 methodology
in 2019
Trinidad and Tobago
1 DB16-20 methodology
in 2019
Georgia rank
82nd
Trinidad and Tobago rank
82nd

Getting electricity: Total duration and frequency of outages per over time

  • Georgia
  • Trinidad and Tobago
00.511.52201420162019

How they compare

Georgia currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Trinidad and Tobago, a difference of 0 DB16-20 methodology.

The two have swapped places 2 times across 6 shared years of data; in 2014 it was Trinidad and Tobago ahead.

Georgia ranks 82nd and Trinidad and Tobago ranks 82nd of 187 countries.

Georgia has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher getting electricity: total duration and frequency of outages per, Georgia or Trinidad and Tobago?
Georgia, at 1 DB16-20 methodology against 1 DB16-20 methodology in Trinidad and Tobago as of 2019.
What is the difference in getting electricity: total duration and frequency of outages per between Georgia and Trinidad and Tobago?
0 DB16-20 methodology, with Georgia ahead.
How many years of comparable data are there for Georgia and Trinidad and Tobago?
6 years are reported by both, from 2014 to 2019.
How do Georgia and Trinidad and Tobago rank globally for getting electricity: total duration and frequency of outages per?
Georgia ranks 82nd and Trinidad and Tobago ranks 82nd of 187 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Total duration and frequency of outages per customer a year (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

Georgia vs Trinidad and Tobago: Getting electricity: Total duration and frequency of outages per. Statizoid. Retrieved 14 September 2026, from https://private-sector.statizoid.com/compare/getting-electricity-total-duration-and-frequency-of-outages-per-customer-a-year-0-3-db16/georgia/trinidad-and-tobago/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-total-duration-and-frequency-of-outages-per-customer-a-year-0-3-db16/georgia/trinidad-and-tobago/">Georgia vs Trinidad and Tobago: Getting electricity: Total duration and frequency of outages per</a> — Statizoid

About this data

Indicator
Getting electricity: Total duration and frequency of outages per customer a year (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 1,122 data points, 2014–2019
Last refreshed

The total duration and frequency of outages per customer a year index evaluates the quality of the power supply. If SAIDI and SAIFI are 12 (equivalent to an outage of one hour each month) or below, a score of 1 is assigned. If SAIDI and SAIFI are 4 (equivalent to an outage of one hour each quarter) or below, 1 additional point is assigned. If SAIDI and SAIFI are 1 (equivalent to an outage of one hour per year) or below, 1 more point is assigned. The index is computed based on the methodology in the DB16-20 studies.