San Marino vs Uruguay: Getting electricity: Total duration and frequency of outages per

San Marino
1 DB16-20 methodology
in 2019
Uruguay
1 DB16-20 methodology
in 2019
San Marino rank
82nd
Uruguay rank
82nd

Getting electricity: Total duration and frequency of outages per over time

  • San Marino
  • Uruguay
00.511.52201420162019

How they compare

San Marino currently reports 1 DB16-20 methodology against 1 DB16-20 methodology in Uruguay, a difference of 0 DB16-20 methodology.

The two have swapped places 1 time across 6 shared years of data; in 2014 it was San Marino ahead.

San Marino ranks 82nd and Uruguay ranks 82nd of 187 countries.

San Marino has averaged higher in every one of the 1 decades both report.

Frequently asked questions

Which has higher getting electricity: total duration and frequency of outages per, San Marino or Uruguay?
San Marino, at 1 DB16-20 methodology against 1 DB16-20 methodology in Uruguay as of 2019.
What is the difference in getting electricity: total duration and frequency of outages per between San Marino and Uruguay?
0 DB16-20 methodology, with San Marino ahead.
How many years of comparable data are there for San Marino and Uruguay?
6 years are reported by both, from 2014 to 2019.
How do San Marino and Uruguay rank globally for getting electricity: total duration and frequency of outages per?
San Marino ranks 82nd and Uruguay ranks 82nd of 187 countries.
Where does this data come from?
The World Bank, published as Getting electricity: Total duration and frequency of outages per customer a year (0-3) (DB16-20 methodology). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

Share, cite or embed this page

Cite this page

San Marino vs Uruguay: Getting electricity: Total duration and frequency of outages per. Statizoid. Retrieved 08 September 2026, from https://private-sector.statizoid.com/compare/getting-electricity-total-duration-and-frequency-of-outages-per-customer-a-year-0-3-db16/san-marino/uruguay/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/compare/getting-electricity-total-duration-and-frequency-of-outages-per-customer-a-year-0-3-db16/san-marino/uruguay/">San Marino vs Uruguay: Getting electricity: Total duration and frequency of outages per</a> — Statizoid

About this data

Indicator
Getting electricity: Total duration and frequency of outages per customer a year (0-3) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
187 places, 1,122 data points, 2014–2019
Last refreshed

The total duration and frequency of outages per customer a year index evaluates the quality of the power supply. If SAIDI and SAIFI are 12 (equivalent to an outage of one hour each month) or below, a score of 1 is assigned. If SAIDI and SAIFI are 4 (equivalent to an outage of one hour each quarter) or below, 1 additional point is assigned. If SAIDI and SAIFI are 1 (equivalent to an outage of one hour per year) or below, 1 more point is assigned. The index is computed based on the methodology in the DB16-20 studies.