Burundi vs Congo, Rep.: Registering property: Procedures
Registering property: Procedures over time
- Burundi
- Congo, Rep.
How they compare
Burundi currently reports 5 number against 5 number in Congo, Rep., a difference of 0 number.
The two have swapped places 1 time across 16 shared years of data; in 2004 it was Burundi ahead.
Burundi ranks 106th and Congo, Rep. ranks 106th of 184 countries.
Burundi has averaged higher in every one of the 2 decades both report.
Head to head by decade
| Decade | Burundi | Congo, Rep. | Difference | Ahead |
|---|---|---|---|---|
| 2000s | 8 number | 5 number | 3 number | Burundi |
| 2010s | 5.9 number | 5 number | 0.9 number | Burundi |
Averages of every year both report within each decade.
Frequently asked questions
- Which has higher registering property: procedures, Burundi or Congo, Rep.?
- Burundi, at 5 number against 5 number in Congo, Rep. as of 2019.
- What is the difference in registering property: procedures between Burundi and Congo, Rep.?
- 0 number, with Burundi ahead.
- How many years of comparable data are there for Burundi and Congo, Rep.?
- 16 years are reported by both, from 2004 to 2019.
- How do Burundi and Congo, Rep. rank globally for registering property: procedures?
- Burundi ranks 106th and Congo, Rep. ranks 106th of 184 countries.
- Where does this data come from?
- The World Bank, published as Registering property: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.
Individual pages
About this data
The time captures the median duration that property lawyers, notaries or registry officials indicate is necessary to complete a procedure. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to obtain transfer the property title, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for procedures that can be fully completed online, for which the time required is recorded as half a day.