Djibouti vs Nigeria: Registering property: Procedures

Djibouti
6 number
in 2019
Nigeria
11.77 number
in 2019
Djibouti rank
1st
Nigeria rank
2nd

Registering property: Procedures over time

  • Djibouti
  • Nigeria
051015200420112019

How they compare

Nigeria currently reports 11.77 number against 6 number in Djibouti, a difference of 5.77 number.

That makes Nigeria's figure about 2.0 times Djibouti's.

Across all 15 years both countries report, Nigeria has been ahead every year.

Djibouti ranks 1st and Nigeria ranks 2nd of 1 countries.

Nigeria has averaged higher in every one of the 2 decades both report.

Head to head by decade

Decade Djibouti Nigeria Difference Ahead
2000s 6 number 13.2 number 7.2 number Nigeria
2010s 6 number 12.36 number 6.36 number Nigeria

Averages of every year both report within each decade.

Frequently asked questions

Which has higher registering property: procedures, Djibouti or Nigeria?
Nigeria, at 11.77 number against 6 number in Djibouti as of 2019.
What is the difference in registering property: procedures between Djibouti and Nigeria?
5.77 number, with Nigeria ahead.
How many years of comparable data are there for Djibouti and Nigeria?
15 years are reported by both, from 2005 to 2019.
How do Djibouti and Nigeria rank globally for registering property: procedures?
Djibouti ranks 1st and Nigeria ranks 2nd of 1 countries.
Where does this data come from?
The World Bank, published as Registering property: Procedures (number). Statizoid refreshes it automatically from the source and publishes the full history for both places.

Individual pages

About this data

Indicator
Registering property: Procedures (number)
Unit
number
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
186 places, 2,876 data points, 2004–2019
Last refreshed

The time captures the median duration that property lawyers, notaries or registry officials indicate is necessary to complete a procedure. It is calculated in calendar days. The time estimates of all procedures are added to calculate the total time required to obtain transfer the property title, taking into account simultaneity of processes. It is assumed that the minimum time required for each procedure is one day, except for proce­dures that can be fully completed online, for which the time required is recorded as half a day.