Dealing with construction … Dealing 0-15 Building control in Cambodia
Cambodia: Dealing with construction permits: Building quality control index was 8 DB16-20 methodology in 2019. ▬ Flat
Dealing with construction permits: Building quality control index in Cambodia, 2014–2019
Source: World Bank. Measured in DB16-20 methodology.
Analysis
Cambodia recorded 8 DB16-20 methodology for dealing with construction permits: building quality control index in 2019. That is the highest value across all 6 years on record.
Compared with earlier readings it is unchanged over ten years.
Cambodia ranks 138th of 186 countries on this measure, in the middle of the range.
Dealing with construction permits: Building quality control index in Cambodia, year by year
| Year | DB16-20 methodology | Change |
|---|---|---|
| 2014 | 8 DB16-20 methodology | — |
| 2015 | 8 DB16-20 methodology | +0.0% |
| 2016 | 8 DB16-20 methodology | +0.0% |
| 2017 | 8 DB16-20 methodology | +0.0% |
| 2018 | 8 DB16-20 methodology | +0.0% |
| 2019 | 8 DB16-20 methodology | +0.0% |
Cambodia compared with similar countries
- Cambodia's 8 DB16-20 methodology is below the median for lower middle income countries, which is 10 DB16-20 methodology, 80% of the median. (47 countries reporting)
- Cambodia's 8 DB16-20 methodology is below the median for East Asia & Pacific, which is 11.5 DB16-20 methodology, 70% of the median. (28 countries reporting)
Countries ranked near Cambodia
- 135 Mali 8.5 DB16-20 methodology compare
- 135 Namibia 8.5 DB16-20 methodology compare
- 137 Brazil 8.39 DB16-20 methodology compare
- 138 Czechia 8 DB16-20 methodology compare
- 138 Dominica 8 DB16-20 methodology compare
- 138 Ecuador 8 DB16-20 methodology compare
- 138 Eswatini 8 DB16-20 methodology compare
- 138 Iceland 8 DB16-20 methodology compare
- 138 Niger 8 DB16-20 methodology compare
- 138 Paraguay 8 DB16-20 methodology compare
- 138 Slovakia 8 DB16-20 methodology compare
- 138 Solomon Islands 8 DB16-20 methodology compare
- 138 Saint Vincent and the Grenadines 8 DB16-20 methodology compare
More private sector data for Cambodia
- Merchandise trade 127.1% (2025)
- Food imports 7.5% (2024)
- Manufactures imports 72.5% (2024)
- Merchandise imports 33.88 billion current US$ (2025)
- Food exports 15.2% (2024)
- Manufactures exports 78.1% (2024)
- Merchandise exports 31.27 billion current US$ (2025)
- Merchandise exports (current US$), per capita 1,752 current US$ per person (2025)
- Merchandise exports (current US$), per unit of GDP 0.61 current US$ per US$ of GDP (2025)
- Merchandise exports (current US$), annual growth rate 17.3 % change on previous year (2025)
Frequently asked questions
- What is dealing with construction permits: building quality control index in Cambodia?
- Dealing with construction permits: building quality control index in Cambodia was 8 DB16-20 methodology in 2019, according to the World Bank.
- What is the highest dealing with construction permits: building quality control index recorded in Cambodia?
- The highest recorded value was 8 DB16-20 methodology in 2014.
- What is the lowest dealing with construction permits: building quality control index recorded in Cambodia?
- The lowest recorded value was 8 DB16-20 methodology in 2014.
- How does Cambodia rank for dealing with construction permits: building quality control index?
- Cambodia ranks 138th out of 186 countries with data for 2019.
- Is dealing with construction permits: building quality control index rising or falling in Cambodia?
- Over the last ten years it is unchanged. The long-run trend across the full record is flat.
- Where does this Cambodia data come from?
- The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.
Download this data
CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).
About this data
The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.