Dealing with construction permits: Building quality control index in Marshall Islands, Republic of the

Marshall Islands, Republic of the: Dealing with construction permits: Building quality control index was 1 DB16-20 methodology in 2019. β–¬ Flat

Latest (2019)
1 DB16-20 methodology
Change on year
unchanged
World rank
183rd
of 185 countries
All-time high
1 DB16-20 methodology
in 2014
All-time low
1 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Building quality control index in Marshall Islands, Republic of the, 2014–2019

00.20.40.60.812014201620192014: 1 DB16-20 methodology2015: 1 DB16-20 methodology2016: 1 DB16-20 methodology2017: 1 DB16-20 methodology2018: 1 DB16-20 methodology2019: 1 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

In 2019, dealing with construction permits: building quality control index in Marshall Islands, Republic of the stood at 1 DB16-20 methodology. That is the highest value across all 6 years on record.

Compared with earlier readings it is unchanged over ten years.

That places Marshall Islands, Republic of the 183rd out of 185 countries with data for 2019, putting it in the bottom quarter.

Countries ranked near Marshall Islands, Republic of the

  1. 180 Afghanistan, Islamic Republic of 3 DB16-20 methodology compare
  2. 180 Timor-Leste, Democratic Republic of 3 DB16-20 methodology compare
  3. 182 Liberia 2 DB16-20 methodology compare
  4. 183 Equatorial Guinea, Republic of 1 DB16-20 methodology compare
  5. 185 Micronesia, Federated States of 0 DB16-20 methodology compare

See the full ranking of 185 places β†’

More private sector data for Marshall Islands, Republic of the

All data for Marshall Islands, Republic of the β†’

Frequently asked questions

What is dealing with construction permits: building quality control index in Marshall Islands, Republic of the?
Dealing with construction permits: building quality control index in Marshall Islands, Republic of the was 1 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: building quality control index recorded in Marshall Islands, Republic of the?
The highest recorded value was 1 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: building quality control index recorded in Marshall Islands, Republic of the?
The lowest recorded value was 1 DB16-20 methodology in 2014.
How does Marshall Islands, Republic of the rank for dealing with construction permits: building quality control index?
Marshall Islands, Republic of the ranks 183rd out of 185 countries with data for 2019.
Is dealing with construction permits: building quality control index rising or falling in Marshall Islands, Republic of the?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Marshall Islands, Republic of the data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV Β· JSON β€” 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

Share, cite or embed this page

Cite this page

Dealing with construction permits: Building quality control index in Marshall Islands, Republic of the. Statizoid. Retrieved 18 August 2026, from https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/marshall-islands/

Embed or link this data

Paste this into a page to link back to these figures. The data itself is free to reuse under CC BY 4.0 (World Bank Open Data); please keep the attribution.

<a href="https://private-sector.statizoid.com/stat/dealing-with-construction-permits-building-quality-control-index-0-15-db16-20-methodology-2/marshall-islands/">Dealing with construction permits: Building quality control index in Marshall Islands, Republic of the</a> β€” Statizoid

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.