Dealing with construction permits: Building quality control index (0-1 in Mexico

Mexico: Dealing with construction permits: Building quality control index (0-1 was 11.66 DB16-20 methodology in 2019. ▬ Flat

Latest (2019)
11.66 DB16-20 methodology
Change on year
unchanged
World rank
78th
of 183 countries
All-time high
11.66 DB16-20 methodology
in 2014
All-time low
11.66 DB16-20 methodology
in 2014
Years of data
6
2014–2019

Dealing with construction permits: Building quality control index (0-1 in Mexico, 2014–2019

02.557.51012.52014201620192014: 11.7 DB16-20 methodology2015: 11.7 DB16-20 methodology2016: 11.7 DB16-20 methodology2017: 11.7 DB16-20 methodology2018: 11.7 DB16-20 methodology2019: 11.7 DB16-20 methodology

Source: World Bank. Measured in DB16-20 methodology.

Analysis

The most recent figure for dealing with construction permits: building quality control index (0-1 in Mexico is 11.66 DB16-20 methodology, measured in 2019. That is the highest value across all 6 years on record.

Compared with earlier readings it is unchanged over ten years.

That places Mexico 78th out of 183 countries with data for 2019, putting it in the middle of the range.

Countries ranked near Mexico

  1. 77 Nigeria 11.77 DB16-20 methodology compare
  2. 79 Chad 11.5 DB16-20 methodology compare
  3. 80 Argentina 11 DB16-20 methodology compare
  4. 80 Cape Verde 11 DB16-20 methodology compare
  5. 80 Colombia 11 DB16-20 methodology compare
  6. 80 Costa Rica 11 DB16-20 methodology compare
  7. 80 Cyprus 11 DB16-20 methodology compare
  8. 80 Denmark 11 DB16-20 methodology compare
  9. 80 Estonia 11 DB16-20 methodology compare
  10. 80 Ethiopia 11 DB16-20 methodology compare
  11. 80 Ghana 11 DB16-20 methodology compare
  12. 80 Guatemala 11 DB16-20 methodology compare
  13. 80 Italy 11 DB16-20 methodology compare
  14. 80 Jordan 11 DB16-20 methodology compare
  15. 80 Kyrgyzstan 11 DB16-20 methodology compare
  16. 80 Mozambique 11 DB16-20 methodology compare
  17. 80 Norway 11 DB16-20 methodology compare
  18. 80 Oman 11 DB16-20 methodology compare
  19. 80 Portugal 11 DB16-20 methodology compare
  20. 80 Spain 11 DB16-20 methodology compare
  21. 80 Thailand 11 DB16-20 methodology compare
  22. 80 Togo 11 DB16-20 methodology compare
  23. 80 Uzbekistan 11 DB16-20 methodology compare

See the full ranking of 185 places →

More private sector data for Mexico

All data for Mexico →

Frequently asked questions

What is dealing with construction permits: building quality control index (0-1 in Mexico?
Dealing with construction permits: building quality control index (0-1 in Mexico was 11.66 DB16-20 methodology in 2019, according to the World Bank.
What is the highest dealing with construction permits: building quality control index (0-1 recorded in Mexico?
The highest recorded value was 11.66 DB16-20 methodology in 2014.
What is the lowest dealing with construction permits: building quality control index (0-1 recorded in Mexico?
The lowest recorded value was 11.66 DB16-20 methodology in 2014.
How does Mexico rank for dealing with construction permits: building quality control index (0-1?
Mexico ranks 78th out of 183 countries with data for 2019.
Is dealing with construction permits: building quality control index (0-1 rising or falling in Mexico?
Over the last ten years it is unchanged. The long-run trend across the full record is flat.
Where does this Mexico data come from?
The figures come from the World Bank, published as part of Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology). Statizoid updates them automatically from the source API.

Download this data

CSV · JSON — 6 observations, free to reuse under CC BY 4.0 (World Bank Open Data).

About this data

Indicator
Dealing with construction permits: Building quality control index (0-15) (DB16-20 methodology)
Unit
DB16-20 methodology
Source
World Bank
Licence
CC BY 4.0 (World Bank Open Data)
Coverage
185 places, 1,109 data points, 2014–2019
Last refreshed

The building quality control index is the sum of the following six indices: quality of building regulations, quality control before construction, quality control during construction, quality control after construction, liability and insurance regimes and professional certifications. The component indicator is computed based on the methodology in the DB16-20 studies.